Skip to content
Base and Install

Installation Day: What to Expect

Key takeaways

  • The old lawn comes out first
  • The base is built, sloped and compacted
  • Turf is rolled, seamed and fastened
  • Infill and brushing finish the job

An install takes a few days for most yards.

Day one: out with the old

The crew strips the old lawn, grades the ground and starts the base.

Day two: base and edging

Crushed stone goes down, is sloped and compacted, and edging is set.

Day three: turf

Turf is rolled out, cut, seamed and fastened around the edges.

Finish

Infill is spread and brushed in, the yard is cleaned and the crew walks it with you.

Related services

Questions about your own yard? Call or text 800-224-9245, or use the quote form below.

Request a quote

You only get one chance to make a turf impression.

Tell us about your yard, your pets, your play area or your property and what you would like it to become. We read every message and reply with clear next steps and a plan to walk and measure the space.

  • What the space is for: a lawn, a dog run, a play area, a roof or a field
  • The city, a rough size and any result you saved from a tool on this site
  • A plain-English plan: the base, the turf, the edges and what to expect, before anything is built
Prefer to talk? Call or text800-224-9245

Your turf quote request

Prefer to type? Text your request. We only use your details to respond to your request.